Page Title
I added a "Change Order Request" at the cost of $2500. to my current re-roofing contract to "Install Additional
Site Alerts Enabled
Site Report for: www.justanswer.com
Account Status:
Verified
The badge holder's account has a good standing membership of DMCA.com's Protection Pro service and its information has been verified. For more info visit the FAQ.
Protection Status:
???
Active
DMCA.com has scanned and approved this specific page for protection.
Protection Duration:
0 days
You must be logged in and a Protection Pro member to do manual rescans. Click to login.
For more info visit the FAQ.
Protection Started: 03/23/2018
Last Checked: 11/07/2019
Checking Protection Status...
I added a "Change Order Request" at the cost of $2500. to my current re-roofing contract to "Install - Answered by a verified Consumer Protection Lawyer
Protection:
This Uniform Resource Locator or URL: https://www.justanswer.com/consumer-protection-law/90a6a-added-change-order-request-cost-2500.html is owned or published under permission by the owner of this channel. The audio and or video presentation is original content and or contains original content published under permission including but not limited to text, design, images, photographs, audio and video and are considered to be the Intellectual Property of the owner of this channel, whether copyrighted or not, and are protected by DMCA.com Protection Pro Service using but not limited to the Digital Millennium Copyright Act Title 17 Chapter 512 (c)(3). Reproduction or re-publication of this content is prohibited without permission. This statement and the protection service connected to it is no way a replacement of or connected to any similar statements or services provided to the content owner by this service platform.
Digital Millennium Copyright Act:
Is part of US Copyright Law. It addresses penalties for copyright infringement found on the Internet. This act protects content creators by "establishing procedures for proper notification" to OSPs when copyright infringement is identified online. Online Copyright Infringement Liability Limitation Act (OCILLA), Title II is part of the DMCA as Section 512 to the Copyright Act and creates a conditional safe harbour to liability for copyright infringement by online service providers. These procedures allow proper DMCA Takedown Notices to be filed by the owner of this website or DMCA.com, as their designated agent, to an OSP in case infringed material has been detected on their servers.
You must be logged in and a Protection Pro member to decode the security signature. Click to login.
aHR0cHM6Ly93d3cuanVzdGFuc3dlci5jb20vY29uc3VtZXItcHJvdGVjdGlvbi1sYXcvOTBhNmEtYWRkZWQtY2hhbmdlLW9yZGVyLXJlcXVlc3QtY29zdC0yNTAwLmh0bWw1
aHR0cHM6Ly93d3cuanVzdGFuc3dlci5jb20vY29uc3VtZXItcHJvdGVjdGlvbi1sYXcvOTBhNmEtYWRkZWQtY2hhbmdlLW9yZGVyLXJlcXVlc3QtY29zdC0yNTAwLmh0bWw1
Report Certificate
DMCA.com is a global leader in Free & Premium Website Content Protection Services
How It Works
A DMCA.com Protection Badge is added to a website to provide content protection.
Get a FREE Badge for your Blogger Blog
Why am I seeing this Website Certificate
This DMCA.com status page is linked to DMCA.com Protection Badge located on a webpage. This Certificate provides a statement of webpage content
ownership. It also provides the website visitor with the status of the website owners' content protection.
Learn More.
DMCA.com Key Stat
» 6088888 Pages Protected